Video Wall Layout

  • 3×4 LCD configuration
  • Barco controller
  • Signal redundancy

Operations

  • 24/7 monitoring
  • Multi-source display
  • Operator training

Case Study Detail

Enterprise Control Room — TP.HCM

Project detail of control room by Stellar with Barco Video Walls solution.

Project overview

Project overview

CustomerEnterprise (NDA)
ProblemBuilding a control room with the ability to monitor multiple sources, continuous operation 24/7
ScopeSurvey, design system, supply Barco devices, installation, signal integration, operator training
ConfigurationLCD video wall 3×4, controller Barco, content management system and signal redundancy
ResultStable system, optimal operator view, easy to expand by phase

Design

Partition the screen according to the priority of information and the operator's view.

Deployment

Installation, configuration controller, color correction and test operation.

Handover

Operator training, SOP handover and after-deployment support.

Next step

Interested in similar projects?

Contact Stellar to receive detailed consultation and capability documentation by your field.